The Mvt type I am using won't allow to adopt a PO.
Is there any way that we can add last GR date to the batch through MB1A ? since this is the requirement.
The Mvt type I am using won't allow to adopt a PO.
Is there any way that we can add last GR date to the batch through MB1A ? since this is the requirement.