Hi Sergiy,
Thanks for the reply. I did check the link you have given but it is related to planned order integration.
I wanted to know if I can do a direct back flush in ECC when confirmation is triggered from ME. In this case there is no floor stock maintained in ME.
My understanding is that the check box ER Backflush in Build tab of material in ME is meant for that. Wanted to confirm the same.
Perhaps I can post one more query here. If raw materials are WM - HU managed in ECC then can these be sent to ME and handled there? INVCON Idoc will be used in this case also?
Thank
Srinivas